Wing Fitted, Gear Tweaked
1 min readJan 9, 2019
We now have the right wing fitted and bolted up to the main spar. The landing gear operation has been improved but there is still room for more tweaks to smooth it out. Things are progressing in the cabin with the pressurization controller now in and the air lines run between it and the outflow valves.