Dan preparing to pull the wiring that goes from the nose to the aft section through the keel conduits

Quite a lot of progress this week with Jeff spraying the finish paint on the door frames. Dan has moved on to the wiring of the engine and other systems. Devin has finished off the trimming and sanding on all the wing skins. I got the doors ready for paint and have also created the parts of the extra engine brace so they’re ready for Britt to weld up. I also picked up and Arduino and have begun setting it up to control the inflow for cabin pressure.

--

--

Peter Muller
Peter Muller

Written by Peter Muller

Raptor Aircraft is a new kit aircraft company designing a spacious, fast, personal transportation solution.