Gear Up, Gear Down
1 min readJul 21, 2018
A bit of a milestone this week with the gear now cycling up and down under it’s own hydraulic power. The lower rear bulkhead and rear floor braces also got bonded into the fuselage. All that’s left now are radius blocking and layup around the front and rear bulkheads and we’re ready to post cure the fuselage in our makeshift oven. That will all happen soon after Oshkosh Airventure is over.