A/C Condenser Install
Dan is continuing to check items off the engine to do list with the A/C condenser now installed. Devin is busy prepping the bonding areas on most of the remaining flight surface skins. I am starting on the build ups for the door frames in order to reduce the gap between the doors and the frames. It will then take a higher cabin pressure, and subsequently greater cabin expansion, before the seals will give way and leak. We should be able to make it to 5.5 psi if all goes well. If not we’ll settle for 4.5 on the prototype and improve things for production when we redesign the doors.